Your decision depends on industrial integration
Ask each supplier to map the proposed revision to your controls, workpieces, support model and acceptance test. Use demonstrations to define trial questions.
Atlas and Apollo are industrial humanoid candidates. Compare the disclosed product generations, task scope and access route while leaving unreported reliability and deployment-scale fields unknown.
Boston Dynamics · Publication date not disclosed · Source accessed 2026-09-28
Apptronik · Publication date not disclosed · Source accessed 2026-09-28
Full primary content successfully reopened in the final source-health check on 2026-09-28.
On small screens, swipe the table horizontally. Each row carries its own source and review date.
| Decision dimension | Atlas Electric Exact revision / scope Electric Atlas, current enterprise configuration Primary specReviewed Sources 1Atlas industrial humanoid Boston Dynamics · Publication date not disclosed · Source accessed 2026-09-28 | Apollo Exact revision / scope Apollo 2 Primary specReviewed Sources 1Apollo 2 platform Apptronik · Publication date not disclosed · Source accessed 2026-09-28 Full primary content successfully reopened in the final source-health check on 2026-09-28. |
|---|---|---|
| Manufacturer Identify who supplies the physical system. | Boston Dynamics Primary specReviewed Sources 1Atlas industrial humanoid Boston Dynamics · Publication date not disclosed · Source accessed 2026-09-28 | Apptronik Primary specReviewed Sources 1Apollo 2 platform Apptronik · Publication date not disclosed · Source accessed 2026-09-28 Full primary content successfully reopened in the final source-health check on 2026-09-28. |
| Exact version Keep generations, checkpoints and software revisions separate. | Electric Atlas, current enterprise configuration Primary specReviewed Sources 1Atlas industrial humanoid Boston Dynamics · Publication date not disclosed · Source accessed 2026-09-28 | Apollo 2 Primary specReviewed Sources 1Apollo 2 platform Apptronik · Publication date not disclosed · Source accessed 2026-09-28 Full primary content successfully reopened in the final source-health check on 2026-09-28. |
| Product status An announcement or forecast is not present commercial delivery. | Enterprise evaluation and integration pathway Primary specReviewed Sources 1Atlas industrial humanoid Boston Dynamics · Publication date not disclosed · Source accessed 2026-09-28 | Current vendor platform with enterprise enquiry Primary specReviewed Sources 1Apollo 2 platform Apptronik · Publication date not disclosed · Source accessed 2026-09-28 Full primary content successfully reopened in the final source-health check on 2026-09-28. |
| Availability Confirm region, timing and configuration with the supplier. | Qualified prospects contact Boston Dynamics Primary specReviewed Sources 1Atlas industrial humanoid Boston Dynamics · Publication date not disclosed · Source accessed 2026-09-28 | Contact Apptronik for deployment evaluation Primary specReviewed Sources 1Apollo 2 platform Apptronik · Publication date not disclosed · Source accessed 2026-09-28 Full primary content successfully reopened in the final source-health check on 2026-09-28. |
| Task fit Published task positioning is a claim until supported in your setting. | Industrial material handling Company claimReviewed Sources 1Atlas industrial humanoid Boston Dynamics · Publication date not disclosed · Source accessed 2026-09-28 | Packout, kitting, goods movement, inspection and machine tending Company claimReviewed Sources 1Apollo 2 platform Apptronik · Publication date not disclosed · Source accessed 2026-09-28 Full primary content successfully reopened in the final source-health check on 2026-09-28. |
| Payload Match configuration and operating conditions before comparing. | 30 kg sustained; 50 kg instantaneous Primary specReviewed Sources 1Atlas industrial humanoid Boston Dynamics · Publication date not disclosed · Source accessed 2026-09-28 | Not publicly disclosed |
| Height Check the exact hardware configuration and definition. | 1.9 m Primary specReviewed Sources 1Atlas industrial humanoid Boston Dynamics · Publication date not disclosed · Source accessed 2026-09-28 | Not publicly disclosed |
| Weight Accessories and configurations can change the operating figure. | 90 kg Primary specReviewed Sources 1Atlas industrial humanoid Boston Dynamics · Publication date not disclosed · Source accessed 2026-09-28 | Not publicly disclosed |
| Runtime Test workload and duty cycle matter; do not infer missing numbers. | 4 hours, vendor figure Company claimReviewed Sources 1Atlas industrial humanoid Boston Dynamics · Publication date not disclosed · Source accessed 2026-09-28 | Not publicly disclosed |
| Sensing Confirm the sensors included in the proposed configuration. | Tactile sensing and surrounding camera view Company claimReviewed Sources 1Atlas industrial humanoid Boston Dynamics · Publication date not disclosed · Source accessed 2026-09-28 | Not publicly disclosed |
| Model / autonomy stack Do not transfer a family-level demo to another revision. | Not publicly disclosed | Artemis coordinates perception, planning, controls and safety Company claimReviewed Sources 1Apollo 2 platform Apptronik · Publication date not disclosed · Source accessed 2026-09-28 Full primary content successfully reopened in the final source-health check on 2026-09-28. |
| Deployment evidence Follow the dated case and verify its actual hardware generation. | Not publicly disclosed | Not publicly disclosed |
| Pricing / cost A published hardware price may exclude integration and support. | Not publicly disclosed | Not publicly disclosed |
| Integrations Verify exact versions, interfaces and support responsibilities. | Orbit with MES and WMS connections Company claimReviewed Sources 1Atlas industrial humanoid Boston Dynamics · Publication date not disclosed · Source accessed 2026-09-28 | Fleet Connect fleet monitoring and task orchestration Company claimReviewed Sources 1Apollo 2 platform Apptronik · Publication date not disclosed · Source accessed 2026-09-28 Full primary content successfully reopened in the final source-health check on 2026-09-28. |
| Safety / certification Inspect the scope of the complete configuration. | Not publicly disclosed | Not publicly disclosed |
These are evaluation paths, not a ranking. Verify the current terms and run a task-specific trial before committing.
Ask each supplier to map the proposed revision to your controls, workpieces, support model and acceptance test. Use demonstrations to define trial questions.
Require a named customer, source date, exact hardware and bounded task. A partnership announcement or earlier prototype trial is not equivalent evidence.
Boston Dynamics · Official spec · Publication date not disclosed · Source accessed 2026-09-28
Factual summary and attribution only; no upstream prose or dataset redistributed.
Referenced by 4 records: Boston Dynamics · Tote Handling · Manufacturing Assembly · Atlas Electric
Apptronik · Official spec · Publication date not disclosed · Source accessed 2026-09-28
Factual summary and attribution only; no upstream prose or dataset redistributed.
Full primary content successfully reopened in the final source-health check on 2026-09-28.
Referenced by 4 records: Apptronik · Warehouse Picking · Manufacturing Assembly · Apollo